Roland Park Elementary/Middle HVAC

Working with Gipe Associates, SP Arch provided air conditioning this school that was originally built in 1929 and added to two times over the years. The scope included replacing ceilings, bulkheads and windows throughout the building. We also provided design for the replacement of the ceilings and bulkheads in corridors, the cafeteria, kitchen and other key spaces throughout the building. Additionally, we provided detailing for window replacement, pipe penetrations, waterproofing and fire separations.